Main phases of repair in the house

Main stages of repair works in the apartment.

How to start repair of the apartment?

The very first phase of the repair work of old homes is the damage and taking apart first off of the worn out walls and partition walls, removing the wall and ceiling finish. This phase is one of the most "dirty" phases of the repair.

One more amongst the most crucial and "dusty" works is the window block replacement. It is necessary to do this firstly because dirt and dust will be unallowable during following stages and it is restricted at all to open windows during painting and wallpaper works (large drops of the temperature level and wetness are unallowable). After installing windows and windowsills it is needed to pack them immediately in polyethylene film and to cover windowsills in addition by the fiberboard (in order to prevent scratches).

The following phase is circuitry. Electrical wiring can be set up in walls or along the floor. Electrical wiring is made inside the pipes to guarantee electrical security and boost reliability. The pipeline secures circuitry from external damages and permits to change the wire totally without breaking walls and floor just by placing the new wire instead of the old one.

House Painting follows the wiring. The regular mistake throughout the synchronised conducting of such works happens when employees forget to set out among the cable televisions and home painters have actually currently plastered and smoothed out the wall. As a result, additional works are necessary to seal chases after on the ended up wall. The places of the feed switch and wall outlet location and their number must be thought-out ahead of time. The scheme of power circuitry is normally consisted of into the design project.

Later on the system need to be prepared to service in case of failures. In addition to the electrical wirings, the telephone cable television and the television cable are laid out. The power cable television need to not be set out near the telephone and antenna cable televisions to avoid sound pickup and interference. The most strange minute is setting out the television cable television. In order to make 2 (or 3) television set in the house the second cable is often simply "strongly soldered" in parallel, so the cable resistance is lowered. As a result, the display quality is deteriorated, many programs can't be gotten and etc. In order to prevent such situation it is required to welcome a specialist with special equipment. He will measure the signal level of the each TV-feeder and set up TV-amplifiers or TV-filters.

Painting is the most long-lasting procedure, that is why it is conducted at the same time in all premises, if it is possible. Hold-ups are related to the innovation. Each applied layer read these plumbing tips of the plaster (or filling out completing) must dry totally before the work will continue.

Works in hygienic plans and the cooking area begin all at once with home painting. It is better to fulfill so-called "dirty" operate in the top place and all at once. In accordance with the plan of the sanitary specialist area welding, wall chasing and pipeline run are conducted. Steam radiator admissions are prepared, taps and brackets are installed, however radiators are not installed.

Then operates in hygienic arrangements are conducted according to the strategy. The bath is installed, then walls are smoothed out and the tile is laid on walls. The list below stage is assembling ceiling and laying tiles on the floor. And at last other hygienic gadgets, mixers and devices are mounted.

image

After electrical wiring, setup of rosette plates and terminal boxes the voltage is signed in all point. Ends of wiring are insulated and laid out into rosette plates. Sockets and breakers are not set up during this stage in order to save their surface area look. The surface puttying of walls is carried out all at once. The technologically exact control of drying of the layer of the plaster (filling) is performed by drymeter. It is an unique instrument that determines wetness of the material.

The following phase is the process of fill. Fill can be made with various products-- from usual masonry cement-sand mix to self-aligning floors. The benefit of the simple mixture is its cheapness, the disadvantage is that such mixture is much harder lined up at the level and the last dry time of such fill is 40 days, just then the next phase of the deal with flooring can be performed, i.e. the period is too long. Self-leveling self-aligning floors are far more costly, however more technological. Aligning occurs practically "immediately" i.e. fluid service of mix is poured out, then it runs and you receive the horizontal surface. The last dry time is 15 days i.e. you have substantial time economy. The system "warm floor" is set up into the fill. If the so-called "wet procedures" are inapplicable the innovation of the dry lining up (the fill innovation) is utilized bases for floors with adjustable floor battens are mounted.

After fill door boxes and door are set up. Installation of doors should take into the account thickness of future flooring covering. After installation the door can be taken off its hinges and got rid of till the end of repair or loaded into polyethylene movie to secure from damages. Concurrently ceiling can be painted and the tile can be laid in that premises where it was planned. The tile should be laid on the definitely dry overlay.

Finishing of the floor mounting depends upon the prepared covering. Most of the times (if finish covering is not the tile) fill is covered by bitumen mastic and plywood sheets are laid. They are fixed to the flooring by read this plumbing info and learn self-tapping screws. One plywood sheet is fixed by 30-50 self-tapping screws to provide the close repairing of plywood and long-lasting service of the flooring without squeak and bulging. The plywood provides the extra heat- and acoustic insulation. After installing of the plywood is ended up, wallpaper for painting can be pasted on walls.

In properties where finish covering of the flooring is laminated floor covering or parquet stockpile, the regular wallpapers are pasted (not for painting) in the very first place. Then the flooring covering is mounted.

If surface covering of the flooring is the block parquet, the parquet is laid in the top place, then it is scraped and covered by one layer of lacquer. After this the common wall-papers are pasted and the parquet is covered by the rest layers of lacquer (depending on the quality of the parquet and lacquer). The pointed out consequence is connected only with such rushing process when the great amount of dust is created. In spite of the fact that good flooring grinders are equipped with the vacuum cleaner, the enough quantity of dust is precipitated on surrounding subjects including walls. Dust is extremely acerbic and is severely cleaned off. That is why in order not to harm wallpapers, they are pasted after rushing and in order the parquet do not soak up the surplus wetness it is covered by the one layer of lacquer before wallpaper pasting.

After this the primary works can be considered to be finished. It is left just to install the plinths, decorative elements, breakers and sockets, curtain holders, to hang doors, plant-bands and others.

In conclusion it is necessary to note that the series of works was noted in general and can alter depending upon the definite situation-- the number of spaces in property, your resources, peculiarities of the building and construction of the multilevel facilities. It is based on good sense and every person efficient in analysis can separately create such a sequence.